skip to footer block
BCR CRL Mill Aluminum B7S Series Fascia Mount Heavy Duty Square Base Shoe with 3/4" Glazing P14188601BCR-B7S10F https://cdnimages.opentip.com/full/BCR/BCR-B7S10F.jpg CRL Mill Aluminum B7S Series Fascia Mount Heavy Duty Square Base Shoe with 3/4" Glazing Manufacturer Part Number: B7S10F-P For 3/4\" (19 mm) Monolithic Tempered GlassTypically Used as the Base Channel for Glass Railing Systems in Arenas Drilled and Counter Bored 12\" (305 mm) Center-to-Center, or We Will Custom Drill to Your SpecificationsCustom Cutting and Mitering Service Test Reports AvailableThe CRL B7S Series Heavy-Duty Square Base Shoe is used as the base channel for glass railing systems. It can be clad in six choices of architectural finishes. The most critical component in a railing system is the proper attachment of the Base Shoe to the substrate. CRL has engineered and tested a variety of attachment methods, and has developed an acceptable combination of drilling patterns and fasteners. A printed brochure with instructions, installation hints, cleaning, and refinishing techniques is available.Catalog Number:B7S10FStock Length:120\" (3.05 m)Hole Size:9/16\" (14.3 mm)Counter Bore x Depth Holes Drilled C.T.C.:7/8\" (22 mm) x 1/2\" (12.7 mm) 12\" (305 mm)Ship Via:No UPS - Common Carrier OnlyShipping Weight:86 lb (39.01kg)Minimum Order:1 EachGLASS SPECIFICATONS:3/4\" (19 mm) Thick Glass when using TAPER-LOC™ Dry Glaze System or Wet Glaze System.All heavy Base Shoes have a stock length tolerance of plus or minus 3/4\" (19 mm). CRL does not recommend direct powder coating of this base shoe extrusion. Powder coated cladding applied over the base shoe is the recommended method.All pre-drilled CRL Base Shoes have a +1/8 (3 mm)/-1/16 (1.5 mm) tolerance between each hole drilled in the base. Before drilling installation holes in the concrete or steel substrate it is recommended that the installer place the base shoe into the planned final position, then mark the position of the holes to be drilled into the substrate. 14188601 360.0000lbs 0.00 0.00 0.00
CR Laurence
873.06 2025-07-11 95 In Stock

CRL B7S10F Mill Aluminum 120" B7S Series Fascia Mount Heavy-Duty Square Base Shoe with 3/4" Glazing

Brand CR Laurence
Shop more from BCR

SKU: BCR-B7S10F-P
Price: $873.06
Buy in bulk & save 19% ($705.11 each)
Finish:
Quantity:
95 In Stock
*  Shipping Note: Usually ships within 1 to 2 weeks.
*  Click "Add to Cart" to calculate shipping and delivery time.
Share & Earn 10% Cash Back Best Price in Bulk
Price: $873.06 ea X 1 qty = $873.06
Quantity Price Save
1+ $873.06 0%
6+ $705.11 19%
This item is excluded from use of other offer, discount or coupon.

Product Description

Manufacturer Part Number: B7S10F-P

  • For 3/4" (19 mm) Monolithic Tempered Glass
  • Typically Used as the Base Channel for Glass Railing Systems in Arenas Drilled and Counter Bored 12" (305 mm) Center-to-Center, or We Will Custom Drill to Your Specifications
  • Custom Cutting and Mitering Service Test Reports Available


  • The CRL B7S Series Heavy-Duty Square Base Shoe is used as the base channel for glass railing systems. It can be clad in six choices of architectural finishes. The most critical component in a railing system is the proper attachment of the Base Shoe to the substrate. CRL has engineered and tested a variety of attachment methods, and has developed an acceptable combination of drilling patterns and fasteners. A printed brochure with instructions, installation hints, cleaning, and refinishing techniques is available.



    GLASS SPECIFICATONS:
    3/4" (19 mm) Thick Glass when using TAPER-LOC™ Dry Glaze System or Wet Glaze System.

    All heavy Base Shoes have a stock length tolerance of plus or minus 3/4" (19 mm). CRL does not recommend direct powder coating of this base shoe extrusion. Powder coated cladding applied over the base shoe is the recommended method.All pre-drilled CRL Base Shoes have a +1/8 (3 mm)/-1/16 (1.5 mm) tolerance between each hole drilled in the base. Before drilling installation holes in the concrete or steel substrate it is recommended that the installer place the base shoe into the planned final position, then mark the position of the holes to be drilled into the substrate.


    This item is overweight. we may contact you when we process the order.

    warning tips WARNING: This product can expose you to chemicals which are known to the State of California to cause cancer, birth defects, or other reproductive harm. For more information, go to www.p65warnings.ca.gov.

    Return Policy

    Return could only be applied within 7 days after delivery.
    Need more information?
    Our staff are available to answer any questions you may have about this item


    Customer Reviews
    0 reviews
    Be the first to review this item!